Bid Detail

18-020 - General Contractor and Filed Sub Bidder Prequalification for City of Springfield Culinary and Nutrit

End date: Wednesday August 30, 2017 at 2 p.m.

ADVERTISEMENT
CITY OF SPRINGFIELD, MASSACHUSETTS
OFFICE OF PROCUREMENT

SEALED REQUESTS FOR QUALIFICATIONS FOR:

General Contractor and Filed Sub Bidder Prequalification for City of Springfield Culinary and Nutrition Center – City RFQ No.18-020;

will be received until 2:00 PM: August 30, 2017 by:

City of Springfield Office of Procurement
Attn: Theo Theocles, Esq.
Deputy Procurement Officer
36 Court Street Room 307
Springfield MA 01103

This Request for Qualifications will be used to pre-qualify the following Trade Contractors:

Roofing and Flashing, Miscellaneous Metal, Acoustical Tile, Tile, Painting, Plumbing, Heating, Ventilating and Air-Conditioning, Electrical Work, Elevators, Masonry, Fire Protection and General Contractors;which shall be used to prequalify the trade and general contractors and to submit bids issued under Mass. Gen. Laws Ch. 149A, sec. 8. This Request for Qualifications (“RFQ”) is the first phase of a two-phase procurement process as set forth in MGL Chapter 149A. The names of all responders will be posted, however, responses will not be opened publicly. The City of Springfield through its Trade Contractor Prequalification Committee is prequalifying firms interested in providing public Trade Contractor services on this project through this RFQ process. The City of Springfield’s Culinary and Nutrition Trade Contractor Prequalification Committee will evaluate submitted Statements of Qualifications (“SOQs”) based upon the identified evaluation criteria and points set forth below and only those firms obtaining the required minimum points will be deemed prequalified. Only those respondents deemed prequalified will be invited to submit a bid in response to a Request for Bids (“RFB”) which will be issued in the second phase of the procurement process.

Participation in the RFB Bidding Phase of this Project will be limited to ONLY those Trade Contractor firms who have submitted a SOQ (and required supporting documentation) in response to this RFQ and that have been deemed prequalified by the City of Springfield. Trade Contractors that fail to respond to this RFQ and fail to submit an SOQ with the required supporting documentation by the Submission Deadline set forth herein, and Trade Contractors that have not been deemed prequalified by the City of Springfield shall be automatically disqualified from bidding on this Project.
The proposed project is expected to include approximately 2.964 acres, and the area of the facility is anticipated to at 75 Cadwell Drive = 57,000 GSF. Work includes but is not limited to: repaved and expanded parking area, a new generator, new underground grease trap and oi/water separator, a reworked loading dock area, a new elevator, replacement of the two existing stairs, and reinforcing of the structural steel frame to accommodate new HVAC equipment on the roof. Exterior improvements include repainting the masonry façade, adding insulation to the interior side of the exterior masonry walls, new prefabricated aluminum canopies and replacement of all existing exterior doors and windows, roof replacement, new mechanical systems – plumbing and HVAC, and new electrical systems including service upgrade.
The Statement of Qualifications must be signed under pains and penalties of perjury.
Anticipated Procurement Schedule
EVENT DATE
RFQ SOLICITATION: RELEASE DATE August 10, 2017
DEADLINE FOR SUBMISSION OF WRITTEN QUESTIONS
TO CITY OF SPRINGFIELD – OFFICE OF PROCUREMENT
August 23, 2017, 4:30 P.M.
OFFICIAL ANSWERS PUBLISHED (ESTIMATED) August 25, 2017, 4:30 P.M.
SOLICITATION CLOSE DATE / SUBMISSION DEADLINE August 30, 2017, 2:00 P.M.
ANTICIPATED DATE OF RFB TO PREQUALIFIED BIDDERS September 4, 2017
ANTICIPATED DATE OF PRE-BID CONFERENCE September 8, 2017, TBD
ANTICIPATED DATE OF FILED SUB BID OPENING September 8, 2017, 12:00 P.M.
ANTICIPATED DATE OF GENERAL BID OPENING October 5, 2017, 2:00 P.M.
ANTICIPATED DATE OF NOTICE TO PROCEED October 15, 2017
ANTICIPATED COMPLETION DATE OF PROJECT November 1, 2018

The Solicitation Package (Request for Qualifications) will be available August 9, 2017 in person at the Office of Procurement or through the City’s website; www.springfieldcityhall.com.

No questions regarding the RFQ will be accepted after 4:30 PM, August 23, 2017. Questions must be submitted to the attention of Theo Theocles, Deputy Procurement Officer. Facsimile questions are accepted FAX 413-787-6295, Email:ttheocles@springfieldcityhall.com. The Chief Procurement Officer reserves the right to waive any informality in, or to reject any or all responses, if in the public interest to do so.
****************************************************************************

Note to Newspaper: Please publish the above only under the heading "Legal Advertisements" on the following date: August 14, 2017. Please refer to bid # 18-020 when invoicing.

The City of Springfield supports the goal of twenty percent minority and women participation in all contracts. No questions will be answered unless received by the Chief Procurement Officer at least 7 days prior to the expiration of the time set for submitting bids or proposals. The Chief Procurement Officer reserves the right to waive any informality in and to reject any or all bids if it is in the public interest to do so.


Available Solicitations

As of 1:04 pm Thursday, April 25, 2024

24-236 - Interior Painting at Rebecca Johnson Elementary School
End date: Tuesday May 14, 2024 at 2 p.m.

24-235 - Interior Painting at Milton Bradley Elementary School
End date: Tuesday May 14, 2024 at 2 p.m.

24-222 - For Sale: Redevelopment Boston & Albany Railroad at Factory Road/Hendee Street
End date: Monday May 13, 2024 at 2 p.m.

24-234 - Window Shade Replacement at the High School of Commerce
End date: Friday May 10, 2024 at 2 p.m.

24-233 - Fire Escape Repairs at Old Homer St. School
End date: Thursday May 9, 2024 at 2 p.m.

24-232 - Site Improvements at Arthur T. Talmadge Elementary School
End date: Thursday May 9, 2024 at 2 p.m.

24-231 - Site Improvements at Brightwood-Lincoln Elementary School
End date: Thursday May 9, 2024 at 2 p.m.

24-221 - Mary O. Pottenger School Parking Lot Improvement Project
End date: Thursday May 2, 2024 at 2 p.m.

24-220 - Frank H Freedman School Parking Lot Improvement Project
End date: Thursday May 2, 2024 at 2 p.m.

24-219 - Daniel B. Brunton School Parking Lot Improvement Project
End date: Thursday May 2, 2024 at 2 p.m.

24-180 - Roadway & Sidewalk Improvements - Arterial and Residential Streets including Sidewalks
End date: Wednesday May 1, 2024 at 2 p.m.

24-205 - Request for Proposals for Springfield's 2024 Public Mural Program
End date: Monday April 29, 2024 at 2 p.m.

24-226 - Flooring Installation at Mary O. Pottenger Elementary School
End date: Friday April 26, 2024 at 2 p.m.

24-225 - Abatement at Mary O. Pottenger Elementary School
End date: TODAY Thursday April 25, 2024 at 2 p.m.

24-224 - Abatement at Samuel Bowles Elementary School
End date: TODAY Thursday April 25, 2024 at 2 p.m.

24-223 - Abatement at Springfield Public Day Middle School
End date: TODAY Thursday April 25, 2024 at 2 p.m.

XML  RSS 2.0 feed