Bid Detail

21-083 - Sumner Avenue ES Boiler Replacement Project

End date: Thursday January 14, 2021 at 2 p.m.

ADVERTISEMENT
CITY OF SPRINGFIELD, MASSACHUSETTS
OFFICE OF PROCUREMENT

Please see the below legal ad for the following Bids:

1. Bid No. 20-081; Frederick Harris ES Boiler Replacement Project
2. Bid No. 21-082; Indian Orchard ES Boiler Replacement Project
3. Bid No. 21-083; Sumner Avenue ES Boiler Replacement Project

Department of Capital Asset Construction

Sealed bids for a Prime Contractor contract and Filed Sub-Bid contracts are requested through the Office of Procurement. Bidding procedures are per Massachusetts General Laws (M.G.L.) Chapter 149 as amended and other applicable statutes. Chapter 149 requires that the Prime/General Contractor be certified by the State Division of Capital Asset Management in the category, “HVAC.” These projects are MSBA Accelerated Repair Projects.

Bids for Prime/General Contractor, for each listed bid, will be accepted at the Office of Procurement (Room 307 City Hall) until 2:00PM on January 7, 2021, at which time they will be publicly opened and read. Sub Bids, for each listed bid, will be accepted at the Office of Procurement (Room 307 City Hall) until 12:00PM on December 23, 2020, at which time they will be publicly opened and read. Bids will be opened via teleconference. Please call (413) 784-4951 (Participant Code 312372).

1. Bid No. 20-081; Frederick Harris ES Boiler Replacement Project (58 Hartford Terrace, Springfield, MA 01118). Estimated cost is NTE $1,360,000.00. Replacement of two existing conventional boilers with two condensing boilers. In addition, a hot water heater will be replaced as well as the associated piping and pumps for the boiler plant. The Sub-Bidders must be certified by the State Division of Capital Asset Management in the following categories: Plumbing, and Electrical.

2. Bid No. 20-082; Indian Orchard ES Boiler Replacement Project (95 Milton St, Indian Orchard, MA 01151). Estimated cost is NTE $684,000.00. Replacement of single existing conventional boilers with new conventional boiler as well as the associated piping and pumps for the boiler plant. The Sub-Bidders must be certified by the State Division of Capital Asset Management in the following categories: Plumbing, and Electrical.

3. Bid No. 20-083; Sumner Avenue ES Boiler Replacement Project (45 Sumner Ave, Springfield, MA 01108). Estimated cost is NTE $709,000.00. Replacement of single existing conventional boilers with new conventional boiler as well as the associated piping and pumps for the boiler plant. The Sub-Bidders must be certified by the State Division of Capital Asset Management in the following categories: Plumbing, and Electrical.

An optional Site Visit has been scheduled for 12/11/20 at 10:00 A.M. at Sumner Ave, 11:00 A.M. at Frederick Harris, and 12:00 P.M. at Sumner ES. (Contact: Brian Laroche, PCA360 OPM, blaroche@pca360.com (617)680-1286).

Bid Forms and Contract Documents will be available for download at www.biddocsonline.com on December 9, 2020, (may be viewed electronically and hard copy requested) or at Nashoba Blue, Inc. at 433 Main Street, Hudson, MA 01749 (978-568-1167). Bidders requesting Contract Documents to be mailed to them shall include a separate check for $40.00 per set for UPS Ground (or $65.00 per set for UPS overnight), payable to BidDocs ONLINE Inc. to cover mail handling costs.

All questions regarding bids or their specifications must be made in writing and received by the Office of Procurement (ttheocles@springfieldcityhall.com) by 12/18/20 (FSBs) and 1/4/20 (General Bidders) at 4:30 P.M. The MA MWBE participation goals apply to this project. Massachusetts Division of Occupational Safety Prevailing Wage rates may apply. These projects are governed by the City of Springfield Responsible Employer Ordinance. The Chief Procurement Officer/Designee reserves the right to waive any informality in and to reject any or all bids if it is in the public interest to do so.

City of Springfield, MA, Office of Procurement
Theo Theocles, Deputy Procurement Officer

The City of Springfield supports the goal of twenty percent minority and women participation in all contracts. No questions will be answered unless received by the Chief Procurement Officer at least 7 days prior to the expiration of the time set for submitting bids or proposals. The Chief Procurement Officer reserves the right to waive any informality in and to reject any or all bids if it is in the public interest to do so.


Available Solicitations

As of 7:04 am Thursday, April 25, 2024

24-236 - Interior Painting at Rebecca Johnson Elementary School
End date: Tuesday May 14, 2024 at 2 p.m.

24-235 - Interior Painting at Milton Bradley Elementary School
End date: Tuesday May 14, 2024 at 2 p.m.

24-222 - For Sale: Redevelopment Boston & Albany Railroad at Factory Road/Hendee Street
End date: Monday May 13, 2024 at 2 p.m.

24-234 - Window Shade Replacement at the High School of Commerce
End date: Friday May 10, 2024 at 2 p.m.

24-233 - Fire Escape Repairs at Old Homer St. School
End date: Thursday May 9, 2024 at 2 p.m.

24-232 - Site Improvements at Arthur T. Talmadge Elementary School
End date: Thursday May 9, 2024 at 2 p.m.

24-231 - Site Improvements at Brightwood-Lincoln Elementary School
End date: Thursday May 9, 2024 at 2 p.m.

24-221 - Mary O. Pottenger School Parking Lot Improvement Project
End date: Thursday May 2, 2024 at 2 p.m.

24-220 - Frank H Freedman School Parking Lot Improvement Project
End date: Thursday May 2, 2024 at 2 p.m.

24-219 - Daniel B. Brunton School Parking Lot Improvement Project
End date: Thursday May 2, 2024 at 2 p.m.

24-180 - Roadway & Sidewalk Improvements - Arterial and Residential Streets including Sidewalks
End date: Wednesday May 1, 2024 at 2 p.m.

24-205 - Request for Proposals for Springfield's 2024 Public Mural Program
End date: Monday April 29, 2024 at 2 p.m.

24-226 - Flooring Installation at Mary O. Pottenger Elementary School
End date: Friday April 26, 2024 at 2 p.m.

24-225 - Abatement at Mary O. Pottenger Elementary School
End date: TODAY Thursday April 25, 2024 at 2 p.m.

24-224 - Abatement at Samuel Bowles Elementary School
End date: TODAY Thursday April 25, 2024 at 2 p.m.

24-223 - Abatement at Springfield Public Day Middle School
End date: TODAY Thursday April 25, 2024 at 2 p.m.

XML  RSS 2.0 feed