October 2016 Springfield Union Station Photos

October 2016 - General Site Views

Overview of the terminal building

Overview of the concourse

Workers plater the outer concourse ceiling

The elevator installation is in progress

Workers repair the terrazzo floor

Tile flooring was installed in the corridors

The storefront framing has been installed at the west entrance

Carpenters are now framing and sheetrocking the tunnel

A plumber installed one of the many water fountains

Workers install new restroom counters with sinks

Workers pave Frank Murray Street

View of the new visitor drop off and turn around area

Concrete is placed at the main entrance

Landscaping near the future employee parking lot

Overview of the parking garage east elevation with a completed stair tower

Overview of the parking garage west elevation

Workers perform final caulking at windows and curtain walls

A waterproof coating has been placed over the Security Room and Elevator Machine Room