June 2013 - Exploratory Demolition and Site Closing

Worker performing exploratory demolition work on the baggage building retaining wall.

Site fence and traffic barriers closing F.B Murray street at Main St.

Underground buried communications conduit and wood ties uncovered during utility investigations.

Geotechnical drilling rig taking soil borings on the raised track area behind the terminal building.

Geotechnical drilling rig within building taking soil borings for structural analysis.

Exposed terminal ceilings and wall areas for structural and architectural team review.

Rooftop containment on baggage building. Workers are removing the roofing materials within this containment.

Underslab exploration within the building to determine slab thickness and soil conditions.

Second view of rootop containment on the baggage building roof. Roofing abatement is ongoing within this containment.

Utility vault exploration with operational communications utilities shown.