August 2014 - Baggage Building Demolition Begins

Concrete debris from pre-demolition activities of the Baggage Building to prepare for soil nailing activities.

Concrete debris from pre-demolition activities of the Baggage Building to prepare for soil nailing activities.

Concrete debris from pre-demolition activities of the Baggage Building to prepare for soil nailing activities.

The rear of the picture is the retaining wall which is currently being prepared for the installation of soil nails to support the tracks above, prior to demolition of the baggage building.

The picture shows the existing retaining wall on the right which will receive the soil nails. This area will be renovated to connect the terminal building to the future parking garage.

Debris from the continuing Baggage Building demolition

Concrete debris from pre-demolition activities of the Baggage Building to prepare for soil nailing activities.

Concrete debris from pre-demolition activities of the Baggage Building to prepare for soil nailing activities.